Invitation for Bids – Shrubs and Grass Cutting Programme
If you are qualified for the Tenders & Bids for Invitation for Bids – Shrubs and Grass Cutting Programme, Roads Authority (RA) in Malawi is looking for you. Interested candidates are encouraged to submit their applications before the closing date on July 8, 2026. Please refer to the official details below for full instructions on how to apply. Please ensure to mention you found this opportunity on NyasaJobs.com website when submitting your CV and application to the employer or when making online applications for organizations.
GOVERNMENT OF THE REPUBLIC OF MALAWI
ROADS AUTHORITY
Invitation for Bids (IfB)
(National Competitive Bidding)
SHRUBS AND GRASS CUTTING PROGRAMME
1. Scope of works and Source of funding
1.1. The Roads Authority (RA) with funding from Roads Fund has budgeted public funds for the procurement of various works in the 2025 – 2026 financial year. The RA intends to apply part of the funds to cover eligible payments under the implementation of Grass Cutting Programme on Surfaced Main Roads in the country.
1.2. The RA now invites sealed bids from eligible bidders on the Grass-Cutting Programme
1.3. Bidding procedures
1.1. Bidding will be conducted in accordance with the open tendering procedures contained in the Public Procurement and Disposal of Public Assets (PPDA) Act (2025) and the Public Procurement Regulations of 2020 of the Government of the Republic of Malawi and is open to all bidders.
1.2. All eligible bidders are required to show evidence of registration with the Construction Industry Regulatory Authority (CIRA) formerly National Construction Industry Council (NCIC) in the appropriate Civil Engineering Category and have renewed their membership for the current financial year.
1.3. Interested eligible bidders may obtain further information from the RA Regional Offices and inspect the bidding documents at the addresses given below from 0800 – 1200 hours and from 1300 – 1600 hours, Monday to Friday starting from 22nd June, 2026.
(a) Address where documents may be inspected:
(b) Address where documents will be issued:
(c) Address where Bids must be delivered:
(d) Address of Bid Opening:
Northern Region
Regional Manager
Roads Authority
Northern Region Office
P.O. Box 20050
Mzuzu 2
Tel: +265 1 311 065 /+265 888335895
Email: fmkandawire@ra.org.mw
Central Region
Regional Manager
Roads Authority
Central Region Office
ARET Premises along Mchinji Road
PO Box 624, Lilongwe
Tel: +265 1 759 896/ +265 888 209334
Email: cmtawali@ra.org.mw
Southern Region
Regional Manager
Roads Authority
Southern Region Office
Lonhro Building
PO Box 373, Blantyre
Tel: +265 1 847 354 / +265 881465071
Email: ckauma@ra.org.mw
1.4. Bidding Documents: A complete set of Bidding Documents in English may be purchased by interested bidders upon payment of a non-refundable fee of MWK20,000.00 at the RA Regional Offices in the North, Centre and South. Only Bidding Documents for the particular region may be obtained from each Regional Office;
1.5. While bidding documents will also be made available online from the RA Website, bidders who access them through this electronic means must still make payment for each bid they will submit. Bids received without proof of purchase against them will not be considered.
1.6 The method of payment will be a Bank deposit at the NBS Bank account as provided:
NBS Bank: Capital City Service Centre
Account Name: Roads Authority
Account number: 20991453
1.7. Bids shall be valid for a period of 120 days from the date of opening.
1.8. Requests for clarification on bidding documents or general questions must be sent in writing to the address in (3) above at least 7 calendar days before the tender closing date.
1.9. Pre-Bid Meeting: The RA shall NOT hold a prebid meeting but advises prospective bidders to familiarise
themselves with the locations of the projects at their own cost.
1.10. The Roads Authority is not bound to accept the lowest or any tender.
1.11. A margin of preference shall not be applied to all firms wholly owned by Indigenous Black Malawians as provided for under ITB30.1 of the Bid Data Sheet.
1.12. No bidder shall be awarded more than one contract unless if there is no other responsive bidder in that particular contract.
2. Submission of bids
2.1. Bids must be delivered to the respective RA Regional Offices in sealed envelopes clearly marked Procurement Reference Number and Contract Details at or before 10:00 Hours Local Time on 8th July 2026
2.2. All bids must be accompanied by a Bid Securing Declaration Form in the format as provided in Section 4 of the bidding documents. Late bids shall be rejected.
2.3. Bids will be opened in the presence of the bidders’ representatives who choose to attend at the respective RA Regional Offices at 10:00 Hours Local Time on 8th July 2026.
NORTHERN REGION
2025/2026 ROAD AND BRIDGE MAINTENANCE PROGRAMME
| Item No | Project ID Number | Procurement Reference Number | District | Contract Details | Contract Period (Days) | CIRA Category (MWK) |
| 1 | MAI-2-NR-027 | RA/MAI/2025-26/T/SGR/NR/CP/27 | Chitipa | Shrub and Grass Cutting from Nachitipa Stream Navikweta Stream along MO26 Road in Chitipa District |
45 days per Phase | 50 Million and above |
| 2 | MAI-2-NR-028 | RA/MAI/2025-26/T/SGR/NR/CP /28 | Chitipa | Shrub and Grass Cutting from Navikweta Stream – Lufilya Bridge along MO26 Road in Chitipa District |
45 days per Phase | 50 Million and above |
| 3 | MAI-2-NR-029 | RA/MAI/2025-26/T/SGR/NR/KA/29 | Karonga | Shrub and Grass Cutting from Lufilya Bridge – Mwapu Bridge along MO26 Road in Karonga District | 45 days per Phase | 50 Million and above |
| 4 | MAI-2-NR-030 | RA/MAI/2025-26/T/SGR/NR/KA/30 | Karonga | Shrub and Grass Cutting from Mwapu Bridge – Karonga (Junction to MO26 Stadium) along MO26 Road in Karonga District |
45 days per Phase | 50 Million and above |
| 5 | MAI-2-NR-031 | RA/MAI/2025-26/T/SGR/NR/KA/31 | Karonga | Shrub and Grass Cutting from Songwe Border – Kaporo (Pusi) along M001 Road in Karonga District |
45 days per Phase | 50 Million and above |
| 6 | MAI-2-NR-032 | RA/MAI/2025-26/T/SGR/NR/KA/32 | Karonga | Shrub and Grass Cutting from Kaporo (Pusi) -Karonga (Junction to Mwanjabala) along M001 Road in Karonga District |
45 days per Phase | 50 Million and above |
| 7 | MAI-2-NR-033 | RA/MAI/2025-26/T/SGR/NR/KA/33 | Karonga | Shrub and Grass Cutting from Ipyana Bridge -Kasimba Bridge along M0O1 Road in Karonga District |
45 days per Phase | 50 Million and above |
| 8 | MAI-2-NR-034 | RA/MAI/2025-26/T/SGR/NR/KA/34 | Karonga | Shrub and Grass Cutting from Chilumba Jetty – Chitimba Bridge along M1 and S102 Roads in Karonga District |
45 days per Phase | 50 Million and above |
| 9 | MAI-2-NR-035 | RA/MAI/2025-26/T/SGR/NR/KA/35 | Karonga | Shrub and Grass Cutting from Nyungwe Bridge – Chilumba Jetty Junction along M001 Road in Karonga District |
45 days per Phase | 50 Million and above |
| 10 | MAI-2-NR-036 | RA/MAI/2025-26/T/SGR/NR/KA/36 | Karonga | Shrub and Grass Cutting from Chilumba Jetty – Chitimba Bridge along M1 and S102 Roads in Karonga District |
45 days per Phase | 50 Million and above |
| 11 | MAI-2-NR-037 | RA/MAI/2025-26/T/SGR/NR/RU/37 | Rumphi | Shrub and Grass Cutting Chitimba Bridge-Chiweta (M001); and Bwengu to Chikwawa (MO24) Roads in Rumphi District |
45 days per Phase | 50 Million and above |
| 12 | MAI-2-NR-038 | RA/MAI/2025-26/T/SGR/NR/RU/38 | Rumphi | Shrub and Grass Cutting from Phwezi-Phwamphwa- Lura on T305 and T306 Roads in Rumphi District |
45 days per Phase | 50 Million and above |
| 13 | MAI-2-NR-039 | RA/MAI/2025-26/T/SGR/NR/RU/39 | Rumphi | Shrub and Grass Cutting Lura- Hananiya Livingstonia on T305 and S103 Roads in Rumphi District |
45 days per Phase | 50 Million and above |
| 14 | MAI-2-NR-040 | RA/MAI/2025-26/T/SGR/NR/RU/39 | Rumphi | Shrub and Grass Cutting from Lura – Hananiya- Livingstonia on T305 and S103 Roads in Rumphi District | 45 days per Phase | 50 Million and above |
| 15 | MAI-2-NR-041 | RA/MAI/2025-26/T/SGR/NR/MZ/41 | Mzimba | Shrub and Grass Cutting from Lukonkhowe Bridge- Kaka Motel on M001 Road in Mzimba District |
45 days per Phase | 50 Million and above |
| 16 | MAI-2-NR-042 | RA/MAI/2025-26/T/SGR/NR/MZ/42 | Mzimba | Shrub and Grass Cutting from Ekwendeni – Ezondweni on S107 and T308 Roads in Mzimba District |
45 days per Phase | 50 Million and above |
| 17 | MAI-2-NR-043 | RA/MAI/2025-26/T/SGR/NR/MZ/43 | Mzimba | Shrub and Grass Cutting from Geisha (Mzuzu) – Lwafwa on M001 Road in Mzimba District |
45 days per Phase | 50 Million and above |
| 18 | MAI-2-NR-044 | RA/MAI/2025-26/T/SGR/NR/MZ/44 | Mzimba | Shrub and Grass Cutting from Lwafwa – Champhoyo on M001 Road in Mzimba District | 45 days per Phase | 50 Million and above |
| 19 | MAI-2-NR-045 | RA/MAI/2025-26/T/SGR/NR/MZ/45 | Mzimba | Shrub and Grass Cutting from Champhoyo – Mzimba Bridge on M001 Road in Mzimba District | 45 days per Phase | 50 Million and above |
| 20 | MAI-2-NR-046 | RA/MAI/2025-26/T/SGR/NR/MZ/46 | Mzimba | Shrub and Grass Cutting from Mzimba Bridge – Mzimba T/Off – Mzimba Police and Mzimba Police – Mtangatanga on M001, M009 and MO22 Roads in Mzimba District |
45 days per Phase | 50 Million and above |
| 21 | MAI-2-NR-047 | RA/MAI/2025-26/T/SGR/NR/MZ/47 | Mzimba | Shrub and Grass Cutting from Jenda T.C. – Embangweni on S112 Road in Mzimba District |
45 days per Phase | 50 Million and above |
| 22 | MAI-2-NR-048 | RA/MAI/2025-26/T/SGR/NR/NB/48 | Nkhata-Bay | Shrub and Grass Cutting from Mzuzu State Lodge Junction – Kawalazi T/ Off on M005 Road in Nkhata Bay District |
45 days per Phase | 50 Million and above |
| 23 | MAI-2- NR-049 | RA/MAI/2025-26/T/SGR/NR/NB/49 | Nkhata- Bay | Shrub and Grass Cutting  from Kawalazi T/Off -Mukwiya – Nkhata Bay Boma on M005 and T308 Roads in Nkhata Bay District | 45 days per Phase | 50 Million and above |
| 24 | MAI-2- NR-050 | RA/MAI/2025-26/T/SGR/NR/NB/50 | Nkhata-Bay | Shrub and Grass Cutting from Mukwiya – Luweya Bridge on M005 Road in Nkhata Bay District | 45 days per Phase | 50 Million and above |
| 25 | MAI-2- NR-051 | RA/MAI/2025-26/T/SGR/NR/NB/51 | Nkhata- Bay | Shrub and Grass Cutting from Luweya Bridge – Lifupa Bridge on M005 Road in Nkhata Bay District | 45 days per Phase | 50 Million and above |
| 26 | MAI-2- NR-052 | RA/MAI/2025-26/T/SGR/NR/NB/52 | Nkhata-Bay | Shrub and Grass Cutting from Lifupa Bridge -Dwambazi Bridge on M005 Road in Nkhata Bay District | 45 days per Phase | 50 Million and above |
CENTRAL REGION
2025/2026 ROAD AND BRIDGE MAINTENANCE PROGRAMME
| Item No | Project ID Number | Procurement Reference Number | District | Contract Details | Contract Period (Days) | CIRA Category (MWK) |
| 1 | MAI – 2-CR-043 | RA/MAI/2025- 26/T/RM /CR/ KK/043 |
Nkhotakota | Shrubs and Grass Cutting from Dwambadzi Bridge to Dwangwa Trading Centre on M005 Road in Nkhotakota District |
45 days per Phase | 50 Million and above |
| 2 | MAI-2- CR-044 |
RA/MAI/2025-26/T/RM/CR/KU/NS/KK/044 | Kasungu, Ntchisi and Nkhotakota |
Shrubs and Grass Cutting from Chamwabvi to M’bobo and from Nkhotakota Game Reserve Eastern Game Gate to Nkhotakota Boma on M018 Road in Kasungu, Ntchisi and Nkhotakota Districts |
45 days per Phase | 50 Million and above |
| 3 | MAI-2- CR-045 |
RA/MAI/2025-26/T/RM/ CR/ KU/045 |
Kasungu | Shrubs and Grass Cutting from Kasungu to Chamwabvi on M018, Junction with M018 to Chiwengo Village and Kamuzu Academy Turn Off (M018/T325 Junction) to Kamuzu Academy on T325 and Junction with M001 to Nguluyanawambe (S114 ) Roads in Kasungu District. | 45 days per Phase | 50 Million and above |
| 4 | MAI -2- CR-046 |
RA/MAI/2025-26/T/RM/CR/NS/DA/046 | Dowa and Ntchisi | Shrubs and Grass Cutting from Mponela to Ntchisi on T350 Road in Dowa and Ntchisi Districts | 45 days per Phase | 50 Million and above |
| 5 | MAI -2- CR-047 |
RA/MAI/2025-26/T/RM/CR/KU/MC/047 | Kasungu and Mchinji | Shrubs and Grass Cutting from Kapiri to Chinkhoma on M018 Road in Kasungu and Mchinji Districts |
45 days per Phase | 50 Million and above |
| 6 | MAI -2- CR-048 |
RA/MAI/2025- 26/T/RM/ CR/ MC/048 |
Mchinji | Shrubs and Grass Cutting from Kamwendo to Kapiri on M018 Road in Mchinji District. |
45 days per Phase | 50 Million and above |
| 7 | MAI -2- CR-049 |
RA/MAI/2025- 26/T/RM/CR/ MC/049 |
Mchinji | Shrubs and Grass Cutting from Mchinji Boma to Mkanda on (S118) Road in Mchinji District | 45 days per Phase | 50 Million and above |
| 8 | MAI -2- CR-050 |
RA/MAI/2025- 26/T/RM/CR/ MC/050 |
Mchinji | Shrubs and Grass Cutting from Mchinji Border to Guillime on M012 Road in Mchinji District |
45 days per Phase | 50 Million and above |
| 9 | MAI-2- CR-051 |
RA/MAI/2025-26/T/RM/ CR/ MC/LL/051 |
Mchinji and Lilongwe |
Shrubs and Grass Cutting from Guillime to Namitete Bridge on M012 and Junction with M012 to St. Gabriel Hospital Roads in Mchinji and Lilongwe Districts. |
45 days per Phase | 50 Million and above |
| 10 | MAI-2- CR-052 |
RA/MAI/2025-26/T/RM/ CR/ LL/052 |
Lilongwe | Shrubs and Grass Cutting from Namitete Bridge to Mchinji Round About on M012 and Western Bypass Roads in Lilongwe District | 45 days per Phase | 50 Million and above |
| 11 | MAI-2-CR-053 | RA/MAI/2025-26/TD/RM/CR /KU/LL/053 | Kasungu and Lilongwe | Shrubs and Grass Cutting from Santhe to Kapinga on (S117) and Kapinga to Kasiya on (D170) Roads in Kasungu and Lilongwe districts | 45 days per Phase | 50 Million and above |
| 12 | MAI -2- CR-054 |
RA/MAI/2025- 26/1/RM/CR / LL/054 |
Lilongwe | Shrubs and Grass Cutting from Kapinga to Njewa on (S117) Road in and Lilongwe District | 45 days per Phase | 50 Million and above |
| 13 | MAI -2- CR-055 |
RA/MAI/2025-26/T/RM /CR/ LL/055 |
Lilongwe and Dowa | Shrubs and Grass Cutting from Kanengo to Lumbadzi on M01 and Dowa Turn off (M01/M07 Junction) to Chezi (M14/ M16 Junction) Roads in Lilongwe and Dowa Districts |
45 days per Phase | 50 Million and above |
| 14 | MAI -2- CR-056 |
RA/MAI/2025-26/T/RM/CR/LL/DA/056 | Lilongwe and Dowa | Shrubs and Grass Cutting from Kanengo to Chezi on M014 Road in Lilongwe and Dowa Districts | 45 days per Phase | 50 Million and above |
| 15 | MAI -2- CR-057 |
RA/MAI/2025- 26/1/RM/CR / DA/SA/057 |
Dowa and Salima | Shrubs and Grass Cutting from Chezi to Salima on M014 Road in Dowa and Salima Districts | 45 days per Phase | 50 Million and above |
| 16 | MAI -2- CR-058 |
RA/MAI/2025- 26/1/ RM/CR/ SA/058 |
Salima | Shrubs and Grass Cutting from Salima to Livingstonia on S122, Salima to Mayani Turn Off on M005 and MAFCO Roads in Salima district. | 45 days per Phase | 50 Million and above |
| 17 | MAI -2- CR-059 |
RA/MAI/2025- 26/T/RM/CR/ SA/DZ/059 |
Salima and Dedza | Shrubs and Grass Cutting from Mayani Turn Off to Nakaingwa Bridge on M005 and Chipoka Turn Off to Chipoka Jetty on T326 Roads in Salima and Dedza Districts |
45 days per Phase | 50 Million and above |
| 18 | MAI -2- CR-060 |
RA/MAI/2025- 26/1/RM/ CR/ LL/060 |
Lilongwe | Shrubs and Grass Cutting from Bunda Turn Off to Mitundu on S125 and Bunda Turn Off to Matindi Academy on M001 Roads in Lilongwe District. | 45 days per Phase | 50 Million and above |
| 19 | MAI -2- CR-061 |
RA/MAI/2025- 26/T/RM/CR/LL/DZ/061 |
Lilongwe and Dedza |
Shrubs and Grass Cutting from Matindi Academy to Linthipe II Bridge on M001 and from Kamphata to Nkhoma on S121 and T374 Roads in Lilongwe and Dedza Districts |
45 days per Phase | 50 Million and above |
| 20 | MAI -2- CR-062 |
RA/MAI/2025- 26/1/ RM/CR/ DZ/062 |
Dedza | Shrubs and Grass Cutting from Linthipe II Bridge to Masasa Trading Centre on M001 and Dedza Border Roads in Dedza District | 45 days per Phase | 50 Million and above |
| 21 | MAI-2-CR-063 | RA/MAI/2025-26/T/RM/ CR/ NU/063 |
Ntcheu | Shrubs and Grass Cutting from Masasa Trading Centre to Biriwiri Trading Centre on M001 Road in Ntcheu District. |
45 days per Phase | 50 Million and above |
| 22 | MAI-2-CR-064 | RA/MAI/2025- 26/T/RM / CR/ NU/064 |
Ntcheu | Shrubs and Grass Cutting from Biriwiri to Chingeni on M001 Road in Ntcheu District | 45 days per Phase | 50 Million and above |
| 23 | MAI-2-CR-065 | RA/MAI/2025-26/T/RM/CR/ NU/065 |
Ntcheu | Shrubs and Grass Cutting from Bwanje Trading Centre to Balaka Market on M005 and Bilira to Banda (T385) Roads in Ntcheu District. |
45 days per Phase | 50 Million and above |
| 24 | MAI-2-CR-066 | RA/MAI/2025- 26/1/RM/CR/ NU/066 |
Ntcheu | Shrubs and Grass Cutting from Mthumbo trading centre to Bwanje Trading Centre on M005 and Kasinje to Kandeu (S134) Roads in Ntcheu District | 45 days per Phase | 50 Million and above |
| 25 | MAI-2-CR-067 | RA/MAI/2025- 26/1/RM/CR/DZ/NU/066 |
Dedza and Ntcheu | Shrubs and Grass and Cutting from Nakaingwa Bridge to Mthumbo Trading Centre on MO05 Road in Dedza and Ntcheu Districts. |
45 days per Phase | 50 Million and above |
| 26 | MAI- 2- CR-068 |
RA/MAI/2025- 26/T/RM/CR/DZ/NU/068 |
Dedza and Ntcheu | Shrubs and Grass Cutting from Masasa to Golomoti on S127 and from Golomoti to Phanga on M10 Roads in Dedza and Ntcheu Districts | 45 days per Phase | 50 Million and above |
SOUTHERN REGION
2025/2026 ROAD AND BRIDGE MAINTENANCE PROGRAMME – PHASE II
| Item No | Project ID Number | Procurement Reference Number | District | Contract Details | Contract Period (Days) | CIRA Category (MWK) |
| 1 | MAI-2-SR-039 | RA/MAI/2022-23/T/SGR/SR/BLK/39 | Balaka | Shrubs and Grass Cutting on Chingeni – Phalula (M001) Road Balaka District | 45 days per Phase | 50 Million and above |
| 2 | MAI-2-SR-040 | RA/MAI/2022-23/T/SGR/SR/BLK/40 | Balaka | Shrubs and Grass Cutting on Chingeni – Liwonde Barrage (M008 and M003) and Balaka – Khwisa – Chisoni Roads in Balaka District |
45 days per Phase | 50 Million and above |
| 3 | MAI-2-SR-041 | RA/MAI/2022-23/T/SGR/ SR/BLK/41 |
Balaka | Shrubs and Grass Cutting on Mangochi Turn Off – Mpale (M003) Road in Balaka District |
45 days per Phase | 50 Million and above |
| 4 | MAI-2-SR-042 | RA/MAI/2022-23/T/SGR/ SR/MH/42 |
Mangochi | Shrubs and Grass Cutting on Mpale- Koche River (M003 and M010) Roads in Mangochi District | 45 days per Phase | 50 Million and above |
| 5 | MAI-2-SR-043 | RA/MAI/2022-23/T/SGR/ SR/MH/43 |
Mangochi | Shrubs and Grass Cutting on Koche River – Monkey Bay and Chikoko Bay (M010 and S128) Roads in Mangochi District | 45 days per Phase | 50 Million and above |
| 6 | MAI-2-SR-044 | RA/MAI/2022-23/T/SGR/SR/MH/44 | Mangochi | Shrubs and Grass Cutting on Phanga – Mangoma (M010) and Cape Maclear (T378) Roads in Mangochi District | 45 days per Phase | 50 Million and above |
| 7 | MAI-2-SR-045 | RA/MAI/2022-23/T/SGR/SR/MH/45 | Mangochi | Shrubs and Grass Cutting on Chingo – Mwanjati (S129) Road in Mangochi District | 45 days per Phase | 50 Million and above |
| 8 | MAI-2-SR-046 | RA/MAI/2022-23/T/SGR/SR/MH/46 | Mangochi | Shrubs and Grass Cutting on Ntagaluka-Mandimba Bridge (M003 and S131) Roads in Mangochi District |
45 days per Phase | 50 Million and above |
| 9 | MAI-2-SR-047 | RA/MAI/2022-23/T/SGR/ SR/MH/47 |
Mangochi | Shrubs and Grass Cutting on Mandimba Bridge – Nselema [(S131) Road in Mangochi District |
45 days per Phase | 50 Million and above |
| 10 | MAI-2-SR-048 | RA/MAI/2022-23/T/SGR/SR/MHG/48 | Machinga | Shrubs and Grass Cutting on Nselema – Nsanama Road Block (S131) and Kapoloma Roads in Machinga District | 45 days per Phase | 50 Million and above |
| 11 | MAI-2-SR-049 | RA/MAI/2022-23/T/SGR/SR/MHG/49 | Machinga | Shrubs and Grass Cutting on Nsanama Road Block-Liwonde (S131) and Nsanama – Nkhande Bridge (T393) Roads in Machinga District |
45 days per Phase | 50 Million and above |
| 12 | MAI-2-SR-050 | RA/MAI/2022-23/T/SGR/SR/MHG/ZA/50 | Machinga and Zomba | Shrubs and Grass Cutting on Liwonde Barrage – Chikupila Bridge (M003) Road in Machinga and Zomba Districts |
45 days per Phase | 50 Million and above |
| 13 | MAI-2-SR-051 | RA/MAI/2022-23/T/SGR/SR/ZA/51 | Zomba | Shrubs and Grass Cutting on Zomba – Jali – Namadzi Bridge (S144) Road in Zomba District | 45 days per Phase | 50 Million and above |
| 14 | MAI-2-SR-052 | RA/MAI/2022-23/T/SGR/SR/ZA/52 | Zomba | Shrubs and Grass Cutting on Zomba- Namadzi (M003), General Hospital -Changalume Barracks (S139 and S142) and Kuchawe (S065) Roads in Zomba District | 45 days per Phase | 50 Million and above |
| 15 | MAI-2-SR-053 | RA/MAI/2022-23/T/SGR/ SR/MJ/PE/53 | Mulanje and Phalombe | Shrubs and Grass Cutting on Namadzi River – Miseu Folo – Phalombe Boma (S144) in Mulanje and Phalombe Districts |
45 days per Phase | 50 Million and above |
| 16 | MAI-2-SR-054 | RA/MAI/2022-23/T/SGR/ SR/PE/MJ/54 | Phalombe and Mulanje | Shrubs and Grass Cutting on Migowi – Phalombe -Chitakale on (5147 and S148) Roads in Phalombe and Mulanie Districts | 45 days per Phase | 50 Million and above |
| 17 | MAI-2-SR-055 | RA/MAI/2022-23/T/SGR/ SR/MJ/55 | Mulanje | Shrubs and Grass Cutting on Muloza Border Post – Mulanje Boma above (M002) and Sayama – Mathambi (T422) Roads in Mulanje District |
45 days per Phase | 50 Million and above |
| 18 | MAI-2-SR-056 | RA/MAI/2022-23/T/SGR/ SR/MJ/56 |
Mulanje | Shrubs and Grass Cutting from Mulanje Boma -Thuchila Bridge (M002), Nkhonya – Nanthombozi, Thanguzi Mwanakhu, Chinakanaka – Msikawanjala and Mulanje Mission Roads in Mulanje District |
45 days per Phase | 50 Million and above |
| 19 | MAI-2-SR-057 | RA/MAI/2022-23/T/SGR/ SR/MJ/CZ/57 | Mulanje and Chiradzulu | Shrubs and Grass Cutting on Chisitu- Bangwe Police (M004) Road in Mulanje and Chiradzulu Districts | 45 days per Phase | 50 Million and above |
| 20 | MAI-2-SR-058 | RA/MAI/2022-23/T/SGR SR/CZ/MJ/PE/58 |
ChiradzuluMulanje and Phalombe | Shrubs and Grass Cutting on Milepa – Migowi (5145) and Migowi – Chiringa (S147 and T415) Roads in Chiradzulu, Mulanje and Phalombe Districts. | 45 days per Phase | 50 Million and above |
| 21 | MAI-2-SR-059 | RA/MAI/2022-23/T/SGR/ SR/CZ/59 |
Chiradzulu | Shrubs and Grass Cutting on M003 Junction – Chiradzulu Boma (S146), Chiradzulu Boma – Milepa (S1 45) and Nguludi Spur (T411) Roads in Chiradzulu District | 45 days per Phase | 50 Million and above |
| 22 | MAI-2-SR-060 | RA/MAI/2022-23/T/SGR/ SR /CZ/60 | Chiradzulu | Shrubs and Grass Cutting on Chiradzulu Boma Junction Namadzi (M003) Road in Chiradzulu District |
45 days per Phase | 50 Million and above |
| 23 | MAI-2-SR-061 | RA/MAI/2022-23/T/SGR/ SR/NN/61 |
Neno | Shrubs and Grass Cutting on Phalula – Zalewa (M001) Road in Neno District | 45 days per Phase | 50 Million and above |
| 24 | MAI-2-SR-062 | RA/MAI/2022-23/T/SGR/ SR/BT/62 |
Blantyre | Shrubs and Grass Cutting on Zalewa – Lirangwe (M001) Road in Blantyre District | 45 days per Phase | 50 Million and above |
| 25 | MAI-2-SR-063 | RA/MAI/2022-23/T/SGR/ SR/BT/63 |
Blantyre | Shrubs and Grass Cutting on Lirangwe – Chileka Roundabout (M001) and Matindi – NOCMA Oil Fuel Reserves Roads in Blantyre Shrubs |
45 days per Phase | 50 Million and above |
| 26 | MAI-2-SR-064 | RA/MAI/2022-23/T/SGR/ SR/NN/64 |
Neno | Shrubs and Grass Cutting on Zalewa – Zaka (M006) Road in Neno District | 45 days per Phase | 50 Million and above |
| 27 | MAI-2-SR-065 | RA/MAI/2022-23/T/SGR/ SR/NN/65 |
Neno | Shrubs and Grass Cutting on Zaka- Mwalawoyera (T397) Road in Neno District | 45 days per Phase | 50 Million and above |
| 28 | MAI-2-SR-066 | RA/MAI/2022-23/T/SGR/ SR/MN/66 |
Mwanza | Shrubs and Grass Cutting on Zaka- Mozambique Border (M006) and Mwanza Hospital – Kanjedza Primary School (S135) Roads in Mwanza District |
45 days per Phase | 50 Million and above |
| 29 | MAI-2-SR-067 | RA/MAI/2022-23/T/SGR/ SR/BT /67 |
Blantyre | Shrubs and Grass Cutting on Stella Marris – Chikanga (M001) and Mpemba Staff Development Institute (SDI) Roads in Blantyre District | 45 days per Phase | 50 Million and above |
| 30 | MAI-2-SR-068 | RA/MAI/2022-23/T/SGR SR/BT/TO/68 |
Blantyre and Thyolo | Shrubs and Grass Cutting on Limbe- No. 1 (M002) Road in Blantyre and Thyolo Districts | 45 days per Phase | 50 Million and above |
| 31 | MAI-2-SR-069 | RA/MAI/2022-23/T/SGR/ SR/CK/69 |
Chikwawa | Shrubs and Grass Cutting on Chikanga – Chikwawa Boma -Bereu (M001), Dyeratu – Mathumba (S136) and Dyeratu – Chikwawa Boma (T416) Roads in Chikwawa District |
45 days per Phase | 50 Million and above |
| 32 | MAI-2-SR-070 | RA/MAI/2022-23/T/SGR SR /CK/70 |
Chikwawa | Shrubs and Grass Cutting on Bereu- Nchalo – Miseu Folo (M001) Road In Chikwawa District | 45 days per Phase | 50 Million and above |
| 33 | MAI-2-SR-071 | RA/MAI/2022-23/T/SGR/ SR/CK/71 |
Chikwawa | Shrubs and Grass Cutting on Miseu Folo – Ngabu – Sorgin (M001) and Nsangwe – Dolo Roads in Chikwawa District</td |